![]() |
|
| Home | ![]() |
||
| About Us | |||
| Projects | |||
| Press/News | |||
| Contact | |||
| References |
Ragstock Demolition |
|||||
![]() Terra General Contractors was selected by Metro Transit to provide Council’s Authorized Representative services on the 212,000 square-foot demolition of the Ragstock warehouse building in Minneapolis. The project also includes environmental remediation of contaminated soils and building materials. Terra has a 2-year master contract with Metro Transit. Project Manager: Ben Newlin |
|
||||
Copyright 2007 All rights reserved |
21025 Commerce Blvd. Rogers, MN 55374 |
ph: 763-463-0220 fax: 763-463-0290 |
||||
Site designed by Gold Horse Media |
||||||